Assessment Year | 2013 |
---|---|
Principal Product | Outdoor Furniture |
NAICS | 337125: Household Furniture (except Wood and Metal) Manufacturing |
SIC | 2499: Wood Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
184,000
ft2
|
Annual Production | 6,512,000
pieces
|
Production Hrs. Annual | 3,183
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $551,798 | 4,665,186 |
kWh
|
$0.12 |
Electricity Demand | $0.0 | 11,853 |
kW-mo/yr
|
$0.000 |
Natural Gas | $46,489 | 6,683 |
MMBtu
|
$6.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,888 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $39,377 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,407 | - |
$11,407
96,440
kWh
|
- | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $12,003 | $920 |
$12,003
101,479
kWh
|
- | - | |
03 | 2.4131: Size electric motors for peak operating efficiency | $4,258 | $5,693 |
$4,258
36,001
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,967 | $25,082 |
$15,967
134,997
kWh
|
$0.0
-
kW-mo/yr
|
- | |
05 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $5,706 | $12,000 | - | - |
$5,706
-
MMBtu
|
|
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,547 | $15,000 |
$6,091
51,500
kWh
|
- |
$(-1,544.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $53,888 | $58,695 |
$49,726
420,417
kWh
|
$0.0
-
kW-mo/yr
|
$4,162
-
MMBtu
|
||
TOTAL IMPLEMENTED | $39,377 | $26,002 |
$39,377
332,916
kWh
|
$0.0
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs