ITAC Assessment: GT0787
ITAC logo
ITAC Assessment: GT0787
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Metal Products
NAICS 337125: Household Furniture (except Wood and Metal) Manufacturing
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 480,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,577 6,892,226
kWh
Electricity Demand $131,606 17,648
kW-mo/yr
Electricity Fees $33,303 -
Natural Gas $338,215 49,757
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,152 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,470

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $20,920 $13,200 $20,920
190,362
kWh
- -
02 2.2511: Insulate bare equipment $1,890 $800 - - $1,890
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $550 $550 $550
19,708
kWh
- -
04 2.7224: Reduce space conditioning during non-working hours $655 - $655
24,040
kWh
- -
05 2.8112: Combine utility meters $12,229 $2,000 - $12,229 -
06 2.8114: Change rate schedules or other changes in utility service $19,300 $1,000 - $19,300 -
07 2.2437: Recover waste heat from equipment $6,608 $5,050 $(-117.0)
(-4,476)
kWh
- $6,725
-
MMBtu
TOTAL RECOMMENDED $62,152 $22,600 $22,008
229,634
kWh
$31,529 $8,615
-
MMBtu
TOTAL IMPLEMENTED $21,470 $13,750 $21,470
210,070
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs