ITAC Assessment: OK0648
ITAC logo
ITAC Assessment: OK0648
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Plastic Resin
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 43,500
ft2
Annual Production 42,500
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,410 5,380,000
kWh
Electricity Demand $92,971 -
Electricity Fees $1,670 -
Natural Gas $394,066 131,296
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $298,742 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,766

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.2515: Use optimum thickness insulation $12,108 $2,317 - - - $12,108
-
MMBtu
- -
02 2.2442: Preheat combustion air with waste heat $38,422 $70,536 $(-2,340.0)
(-130,715)
kWh
$(-1,706.0)
-
kW-mo/yr
- $42,468
-
MMBtu
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,590 $4,344 - - $4,590 - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,975 $4,500 $2,975
166,120
kWh
- - - - -
05 2.3511: Use plant owned transformers or lease transformers $6,955 $22,000 - - - - - $6,955
06 4.441: Install automatic packing equipment $59,232 $12,200 n/a - - - - $59,232 -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,683 $240 $1,923
107,460
kWh
- - - $(-240.0) -
08 2.7135: Install occupancy sensors $94 $288 $94
5,460
kWh
- - - - -
09 2.2422: Use waste heat from hot flue gases to generate steam $169,242 $37,910 n/a - - - $169,242
-
MMBtu
- -
10 2.2514: Cover open tanks $1,983 $752 - - - $1,983
-
MMBtu
- -
11 2.2136: Install / repair insulation on steam lines $1,458 $702 - - - $1,458
-
MMBtu
- -
TOTAL RECOMMENDED $298,742 $155,789 $2,652
148,325
kWh
$(-1,706.0)
-
kW-mo/yr
$4,590 $227,259
-
MMBtu
$58,992 $6,955
TOTAL IMPLEMENTED $16,766 $7,057 $4,898
273,580
kWh
- - $12,108
-
MMBtu
$(-240.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs