Assessment Year | 2002 |
---|---|
Principal Product | Plastic Resin |
NAICS |
n/a
|
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $10 M to 50M |
# of Employees | 54 |
Plant Area |
43,500
ft2
|
Annual Production | 42,500
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $96,410 | 5,380,000 |
kWh
|
$0.018 |
Electricity Demand | $92,971 | - |
|
- |
Electricity Fees | $1,670 | - |
|
- |
Natural Gas | $394,066 | 131,296 |
MMBtu
|
$3.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $298,742 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,766 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2515: Use optimum thickness insulation | $12,108 | $2,317 | - | - | - |
$12,108
-
MMBtu
|
- | - | |
02 | 2.2442: Preheat combustion air with waste heat | $38,422 | $70,536 |
$(-2,340.0)
(-130,715)
kWh
|
$(-1,706.0)
-
kW-mo/yr
|
- |
$42,468
-
MMBtu
|
- | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,590 | $4,344 | - | - | $4,590 | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,975 | $4,500 |
$2,975
166,120
kWh
|
- | - | - | - | - | |
05 | 2.3511: Use plant owned transformers or lease transformers | $6,955 | $22,000 | - | - | - | - | - | $6,955 | |
06 | 4.441: Install automatic packing equipment | $59,232 | $12,200 | n/a | - | - | - | - | $59,232 | - |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,683 | $240 |
$1,923
107,460
kWh
|
- | - | - | $(-240.0) | - | |
08 | 2.7135: Install occupancy sensors | $94 | $288 |
$94
5,460
kWh
|
- | - | - | - | - | |
09 | 2.2422: Use waste heat from hot flue gases to generate steam | $169,242 | $37,910 | n/a | - | - | - |
$169,242
-
MMBtu
|
- | - |
10 | 2.2514: Cover open tanks | $1,983 | $752 | - | - | - |
$1,983
-
MMBtu
|
- | - | |
11 | 2.2136: Install / repair insulation on steam lines | $1,458 | $702 | - | - | - |
$1,458
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $298,742 | $155,789 |
$2,652
148,325
kWh
|
$(-1,706.0)
-
kW-mo/yr
|
$4,590 |
$227,259
-
MMBtu
|
$58,992 | $6,955 | ||
TOTAL IMPLEMENTED | $16,766 | $7,057 |
$4,898
273,580
kWh
|
- | - |
$12,108
-
MMBtu
|
$(-240.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs