32
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Upholstered household furniture manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0561 #11 Y:2015 | 11 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $813 | $281 | |
| NC0561 #10 Y:2015 | 10 | 2015 | Develop a repair/replace policy | $977 | $4,256 | |
| NC0561 #09 Y:2015 | 09 | 2015 | Turn off equipment when not in use | $2,806 | $4,000 | |
| NC0561 #08 Y:2015 | 08 | 2015 | Utilize higher efficiency lamps and/or ballasts | $863 | $300 | |
| NC0561 #07 Y:2015 | 07 | 2015 | Install occupancy sensors | $1,138 | $1,215 | |
| NC0561 #06 Y:2015 | 06 | 2015 | Utilize higher efficiency lamps and/or ballasts | $9,769 | $32,929 | |
| NC0561 #05 Y:2015 | 05 | 2015 | Utilize higher efficiency lamps and/or ballasts | $48,868 | $143,752 | |
| NC0561 #04 Y:2015 | 04 | 2015 | Eliminate or reduce compressed air usage | $552 | $1,500 | |
| NC0561 #03 Y:2015 | 03 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,361 | $200 | |
| NC0561 #02 Y:2015 | 02 | 2015 | Reduce the pressure of compressed air to the minimum required | $2,608 | $100 | |
| NC0561 #01 Y:2015 | 01 | 2015 | Use / purchase optimum sized compressor | $13,092 | $8,000 | |
| MZ0201 #09 Y:2015 | 09 | 2015 | Turn off equipment during breaks, reduce operating time | $6,653 | - | |
| MZ0201 #08 Y:2015 | 08 | 2015 | Utilize higher efficiency lamps and/or ballasts | $45,907 | $136,500 | |
| MZ0201 #07 Y:2015 | 07 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,703 | $930 | |
| MZ0201 #06 Y:2015 | 06 | 2015 | Install compressor air intakes in coolest locations | $1,397 | $1,500 | |
| MZ0201 #05 Y:2015 | 05 | 2015 | Eliminate or reduce compressed air usage | $12,192 | $12,000 | |
| MZ0201 #04 Y:2015 | 04 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $1,717 | - | |
| MZ0201 #03 Y:2015 | 03 | 2015 | Reschedule plant operations or reduce load to avoid peaks | $19,426 | - | |
| MZ0201 #02 Y:2015 | 02 | 2015 | Eliminate/reduce an operation | $8,491 | - | |
| MZ0201 #01 Y:2015 | 01 | 2015 | Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $108,895 | $375,000 |