ITAC Assessment: MZ0201
ITAC logo
ITAC Assessment: MZ0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Custom casework for residential and commercial applications
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 280,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,100
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $278,203 3,763,200
kWh
Electricity Demand $86,483 13,356
kW-mo/yr
Natural Gas $86,159 10,696
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $208,381 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,907

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $108,895 $375,000 $62,489
845,582
kWh
$31,287
-
kW-mo/yr
$15,119
-
MMBtu
02 3.1161: Eliminate/reduce an operation $8,491 - $4,140
56,000
kWh
$4,351
-
kW-mo/yr
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $19,426 - - $19,426
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,717 - $1,144
15,477
kWh
$573
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $12,192 $12,000 $9,803
132,603
kWh
$2,389
-
kW-mo/yr
-
06 2.4221: Install compressor air intakes in coolest locations $1,397 $1,500 $931
12,599
kWh
$466
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,703 $930 $2,466
33,357
kWh
$1,237
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $45,907 $136,500 $30,593
413,826
kWh
$15,314
-
kW-mo/yr
-
09 2.6212: Turn off equipment during breaks, reduce operating time $6,653 - $6,653
90,000
kWh
- -
TOTAL RECOMMENDED $208,381 $525,930 $118,219
1,599,444
kWh
$75,043
-
kW-mo/yr
$15,119
-
MMBtu
TOTAL IMPLEMENTED $45,907 $136,500 $30,593
413,826
kWh
$15,314
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs