Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

782

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Household and institutional furniture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0037 #06 Y:2015 Insulate bare equipment $1,469 $211
IP0037 #05 Y:2015 Heat recovery from specific equipment $1,364 $171
IP0037 #04 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $4,417 $113
IP0037 #03 Y:2015 Lower temperature during the winter season and vice-versa $14,074 $227
IP0037 #02 Y:2015 Reduce the pressure of compressed air to the minimum required $267 -
IP0037 #01 Y:2015 Apply for investment incentives $2,707 -
NC0533 #07 Y:2014 Avoid introducing hot, humid, or dirty air into hvac system $571 $2,500
NC0533 #06 Y:2014 Eliminate or reduce compressed air usage $254 $450
NC0533 #05 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $384 $100
NC0533 #04 Y:2014 Recover waste heat from equipment $751 $3,000
NC0533 #03 Y:2014 Reduce the pressure of compressed air to the minimum required $567 $100
NC0533 #02 Y:2014 Use photocell controls $253 $600
NC0533 #01 Y:2014 Utilize higher efficiency lamps and/or ballasts $6,228 $6,494
NC0526 #11 Y:2014 Develop a repair/replace policy $561 $2,577
NC0526 #10 Y:2014 Install occupancy sensors $1,371 $5,355
NC0526 #09 Y:2014 Utilize higher efficiency lamps and/or ballasts $343 $240
NC0526 #08 Y:2014 Reduce illumination to minimum necessary levels $1,294 $1,438
NC0526 #07 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,791 $8,593
NC0526 #06 Y:2014 Eliminate or reduce compressed air usage $134 $150
NC0526 #05 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $576 $100