Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

780

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Household and institutional furniture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0344 #10 Y:2026 Keep doors and windows shut when not on use $16 -
IC0344 #09 Y:2026 Use or replace with energy efficient substitutes $13,246 $50,000
IC0344 #08 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $2,895 $20,600
IC0344 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $319 $548
IC0344 #06 Y:2026 Install / repair insulation on steam lines $954 $1,353
IC0344 #05 Y:2026 Insulate feedwater tank $551 $660
IC0344 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,531 $1,604
IC0344 #03 Y:2026 Upgrade controls on compressors $12,669 $3,021
IC0344 #02 Y:2026 Use battery storage for demand control $23,871 $30,729
IC0344 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $348 $50
MS0459 #04 Y:2025 Replace fossil fuel equipment with electrical equipment $13,399 $125,000
MS0459 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,256 $15,684
MS0459 #02 Y:2025 Air condition only space necessary $7,093 $18,777
MS0459 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $5,270 $5,219
MS0456 #04 Y:2025 Level zero – install control systems for existing equipment $2,657 $900
MS0456 #03 Y:2025 Install vinyl strip / high speed / air curtain doors $1,170 $14,739
MS0456 #02 Y:2025 Do not use compressed air for personal cooling $603 -
MS0456 #01 Y:2025 Replace fossil fuel equipment with electrical equipment $31,025 $150,000
MU0076 #11 Y:2025 Install occupancy sensors $176 $647
MU0076 #10 Y:2025 Use or replace with energy efficient substitutes $412 $3,346