Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

742

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Household and institutional furniture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0991 #06 Y:2024 Use solar heat to make electricty $30,391 $338,893
GT0991 #05 Y:2024 Turn off equipment when not in use $241 $1,233
GT0991 #04 Y:2024 Eliminate or reduce compressed air usage $1,011 $2,100
GT0991 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $642 $400
GT0991 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,393 $1,850
GT0991 #01 Y:2024 Conserve energy by efficient use of vending machines $453 $180
LE0568 #09 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $9,779 $78,580
LE0568 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,570 $9,661
LE0568 #07 Y:2024 Reduce the pressure of compressed air to the minimum required $684 $950
LE0568 #06 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $17,295 $12,500
LE0568 #05 Y:2024 Insulate bare equipment $1,730 $1,215
LE0568 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,155 $1,400
LE0568 #03 Y:2024 Install timers and/or thermostats $6,769 $1,120
LE0568 #02 Y:2024 Turn off equipment during breaks, reduce operating time $3,890 $200
LE0568 #01 Y:2024 Change rate schedules or other changes in utility service $8,304 -
CC0031 #06 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $6,100 $3,000
CC0031 #05 Y:2023 Reduce the pressure of compressed air to the minimum required $3,751 -
CC0031 #04 Y:2023 Utilize controls to operate equipment only when needed $147 $340
CC0031 #03 Y:2023 Use or replace with energy efficient substitutes $34,115 $205,795
CC0031 #02 Y:2023 Utilize controls to operate equipment only when needed $14,525 $19,500