Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

87

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Furniture and related product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0344 #09 Y:2026 Use or replace with energy efficient substitutes $13,246 $50,000
IC0344 #08 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $2,895 $20,600
IC0344 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $319 $548
IC0344 #06 Y:2026 Install / repair insulation on steam lines $954 $1,353
IC0344 #05 Y:2026 Insulate feedwater tank $551 $660
IC0344 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,531 $1,604
IC0344 #03 Y:2026 Upgrade controls on compressors $12,669 $3,021
IC0344 #02 Y:2026 Use battery storage for demand control $23,871 $30,729
IC0344 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $348 -
WM0005 #07 Y:2012 Increase amount of waste recovered for resale $982 $3,646
WM0005 #06 Y:2012 Recover and reuse waste material $27,546 $9,000
WM0005 #05 Y:2012 Close holes and openings in building such as broken windows $2,321 $95
WM0005 #04 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $365 $2,000
WM0005 #03 Y:2012 Install skylights $2,119 $4,205
WM0005 #02 Y:2012 Install occupancy sensors $1,819 $200
WM0005 #01 Y:2012 Reduce illumination to minimum necessary levels $3,565 $1,150
BD0385 #11 Y:2010 Utilize higher efficiency lamps and/or ballasts $522 $349
BD0385 #10 Y:2010 Utilize higher efficiency lamps and/or ballasts $767 $3,445
BD0385 #09 Y:2010 Install skylights $1,481 $2,500
BD0385 #08 Y:2010 Use photocell controls $2,458 $3,750