Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,812

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Furniture and related product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0459 #04 Y:2025 Replace fossil fuel equipment with electrical equipment $13,399 $125,000
MS0459 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,256 $15,684
MS0459 #02 Y:2025 Air condition only space necessary $7,093 $16,009
MS0459 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $5,270 $5,219
MS0456 #04 Y:2025 Level zero – install control systems for existing equipment $2,657 $900
MS0456 #03 Y:2025 Install vinyl strip / high speed / air curtain doors $1,170 $14,739
MS0456 #02 Y:2025 Do not use compressed air for personal cooling $603 -
MS0456 #01 Y:2025 Replace fossil fuel equipment with electrical equipment $31,025 $150,000
SU0578 #18 Y:2025 Use cooling tower or economizer to replace chiller cooling $4,025 $15,784
SU0578 #17 Y:2025 Install / repair insulation on steam lines $1,185 $2,822
SU0578 #16 Y:2025 Install occupancy sensors $574 $1,355
SU0578 #15 Y:2025 Conserve energy by efficient use of vending machines $350 $745
SU0578 #14 Y:2025 Use or replace with energy efficient substitutes $1,331 $2,080
SU0578 #13 Y:2025 Insulate bare equipment $294 $445
SU0578 #12 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $53,073 $79,597
SU0578 #11 Y:2025 Utilize higher efficiency lamps and/or ballasts $16,627 $14,880
SU0578 #10 Y:2025 Turn off equipment when not in use $5,324 $2,320
SU0578 #09 Y:2025 Reduce ventilation air $1,135 $499
SU0578 #08 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $525 $107
SU0578 #07 Y:2025 Use or replace with energy efficient substitutes $874 $58