472
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MZ0388 #07 Y:2025 | 07 | 2025 | Lower temperature during the winter season and vice-versa | $3,985 | $1,400 |
n/a
|
| MZ0388 #06 Y:2025 | 06 | 2025 | Install occupancy sensors | $410 | $1,100 |
n/a
|
| MZ0388 #05 Y:2025 | 05 | 2025 | Use or replace with energy efficient substitutes | $106,061 | $925,500 |
n/a
|
| MZ0388 #04 Y:2025 | 04 | 2025 | Use solar heat to make electricty | $54,550 | $446,580 |
n/a
|
| MZ0388 #03 Y:2025 | 03 | 2025 | Eliminate or reduce compressed air usage | $3,133 | $13,126 |
n/a
|
| MZ0388 #02 Y:2025 | 02 | 2025 | Recover waste heat from equipment | $4,616 | $10,320 |
n/a
|
| MZ0388 #01 Y:2025 | 01 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $4,848 | $6,300 |
n/a
|
| UF0639 #10 Y:2025 | 10 | 2025 | Replace existing equipment with more suitable substitutes | $20,000 | $3,560 |
n/a
|
| UF0639 #09 Y:2025 | 09 | 2025 | Improve space comfort conditioning | $80,680 | $22,260 |
n/a
|
| UF0639 #08 Y:2025 | 08 | 2025 | Upgrade controls on compressors | $2,190 | $754 |
n/a
|
| UF0639 #07 Y:2025 | 07 | 2025 | Upgrade obsolete equipment | $3,622 | $396 |
n/a
|
| UF0639 #06 Y:2025 | 06 | 2025 | Upgrade obsolete equipment | $3,702 | $8,000 |
n/a
|
| UF0639 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $5,453 | - |
n/a
|
| UF0639 #04 Y:2025 | 04 | 2025 | Install common header on compressors | $6,214 | $900 |
n/a
|
| UF0639 #03 Y:2025 | 03 | 2025 | Utilize controls to operate equipment only when needed | $25,305 | $25,400 |
n/a
|
| UF0639 #02 Y:2025 | 02 | 2025 | Use demand controller or load shedder | $33,218 | $22,992 |
n/a
|
| UF0639 #01 Y:2025 | 01 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $18,135 | $18,588 |
n/a
|
| DL0266 #09 Y:2025 | 09 | 2025 | Lower ceiling to reduce conditioned space | $2,537 | $20,700 |
n/a
|
| DL0266 #08 Y:2025 | 08 | 2025 | Use proper thickness of insulation on building envelope | $1,533 | $7,200 |
n/a
|
| DL0266 #07 Y:2025 | 07 | 2025 | Improve air circulation with destratification fans / other methods | $988 | $5,100 |
n/a
|