Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

455

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ship and boat building
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0266 #09 Y:2025 Lower ceiling to reduce conditioned space $2,537 $20,700
DL0266 #08 Y:2025 Use proper thickness of insulation on building envelope $1,533 $7,200
DL0266 #07 Y:2025 Improve air circulation with destratification fans / other methods $988 $5,100
DL0266 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,511 $2,607
DL0266 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,109 $9,700
DL0266 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $317 $500
DL0266 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $689 $1,400
DL0266 #02 Y:2025 Recover heat from exhausted steam, hot air or hot water $1,212 $2,300
DL0266 #01 Y:2025 Reduce space conditioning during non-working hours $1,316 -
LS2503 #04 Y:2024 Upgrade controls on compressors $17,101 $12,500
LS2503 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $172,248 $79,397
LS2503 #02 Y:2024 Utilize daylight whenever possible in lieu of artificial light $58,573 $1,218
LS2503 #01 Y:2024 Install timers and/or thermostats $3,511 $40
TT0320 #09 Y:2024 Eliminate or reduce compressed air usage $8,140 $26,000
TT0320 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $12,037 $75,000
TT0320 #07 Y:2024 Use solar heat to make electricty $57,337 $238,118
TT0320 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,087 $6,080
TT0320 #05 Y:2024 Meter recycled water (to reduce sewer charges) $6,052 $7,500
TT0320 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $18,949 $23,783
TT0320 #03 Y:2024 Recover waste heat from equipment $17,320 $15,000