ITAC Assessment: MZ0388
ITAC logo
ITAC Assessment: MZ0388
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Aluminum boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 140,387
ft2
Annual Production 4,817
pieces
Production Hrs. Annual 3,840
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $268,904 3,142,110
kWh
Electricity Demand $89,721 11,067
kW-mo/yr
Natural Gas $402,062 22,350
MMBtu
Waste Disposal Costs
Water Usage $19,641 6,067
Tgal
Water Disposal $38,100 6,067
Tgal
TOTAL YEARLY COSTS $818,428
RECOMMENDED SAVINGS* $177,603 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,848 $6,300 $4,848
53,862
kWh
- - -
02 2.2437: Recover waste heat from equipment $4,616 $10,320 - - $4,616
-
MMBtu
-
03 2.4239: Eliminate or reduce compressed air usage $3,133 $13,126 $2,460
28,607
kWh
$673
-
kW-mo/yr
- -
04 2.9114: Use solar heat to make electricty $54,550 $446,580 $54,550
634,299
kWh
- - -
05 2.4322: Use or replace with energy efficient substitutes $106,061 $925,500 $30,580
355,583
kWh
$10,481
-
kW-mo/yr
- $65,000
06 2.7135: Install occupancy sensors $410 $1,100 $410
4,817
kWh
- - -
07 2.7221: Lower temperature during the winter season and vice-versa $3,985 $1,400 $1,323
15,388
kWh
- $2,662
-
MMBtu
-
TOTAL RECOMMENDED $177,603 $1,404,326 $94,171
1,092,556
kWh
$11,154
-
kW-mo/yr
$7,278
-
MMBtu
$65,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs