Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Guided missile and space vehicle propulsion unit and propulsion unit parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0112 #06 Y:2006 Make a practice of turning off lights when not needed $1,030 -
UU0112 #05 Y:2006 Turn off steam / hot water lines leading to space heating units $65,810 $442,960
UU0112 #04 Y:2006 Install smaller boiler (increase high fire duty cycle) $69,680 $200,000
UU0112 #03 Y:2006 Close off unneeded steam lines $140,530 $250,000
UU0112 #02 Y:2006 Repair or replace steam traps $121,540 $8,720
UU0112 #01 Y:2006 Turn off equipment when not in use - -
UU0051 #07 Y:2003 Use closed cycle process to minimize waste water production $2,270 $8,450
UU0051 #06 Y:2003 Use waste heat from hot flue gases to preheat $1,510 $5,980
UU0051 #05 Y:2003 Keep doors and windows shut when not on use $2,823 -
UU0051 #04 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $7,130 $11,800
UU0051 #03 Y:2003 Install compressor air intakes in coolest locations $1,845 $961
UU0051 #02 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $744 $340
UU0051 #01 Y:2003 Reduce illumination to minimum necessary levels $6,232 -