Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,341

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other motor vehicle parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0259 #05 Y:2026 Install spectral reflectors / delamp $265 -
WM0259 #04 Y:2026 Install adequate dryers on air lines to eliminate blowdown $1,514 $1,508
WM0259 #03 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $24,491 $20,000
WM0259 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $46,427 $10,000
WM0259 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $134,432 -
DL0268 #11 Y:2025 Use optimum thickness insulation $1,331 $30,000
DL0268 #10 Y:2025 Install vinyl strip / high speed / air curtain doors $3,280 $33,000
DL0268 #09 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,463 $25,000
DL0268 #08 Y:2025 Improve air circulation with destratification fans / other methods $1,003 $8,640
DL0268 #07 Y:2025 Install timers and/or thermostats $192 $280
DL0268 #06 Y:2025 Install timers and/or thermostats $7,041 $6,750
DL0268 #05 Y:2025 Recover waste heat from equipment $670 $2,000
DL0268 #04 Y:2025 Turn off equipment when not in use $1,672 -
DL0268 #03 Y:2025 Use optimum temperature $879 -
DL0268 #02 Y:2025 Install timers and/or thermostats $808 -
DL0268 #01 Y:2025 Turn off equipment when not in use $1,184 -
MS0458 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $10,619 $6,958
MS0458 #04 Y:2025 Install an uninteruptable power supply $641,025 $2,463,127
MS0458 #03 Y:2025 Use solar heat to make electricty $179,318 $1,231,714
MS0458 #02 Y:2025 Install replacement doors $37,927 $16,051