Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

270

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle seating and interior trim manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2506 #08 Y:2025 Install timers and/or thermostats $8,437 $1,150
UC2506 #07 Y:2025 Modify startup/shutdown times $18,810 -
UC2506 #06 Y:2025 Install partitions to reduce size of conditioned space $136 $557
UC2506 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,755 $1,600
UC2506 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $3,873 $75
UC2506 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $10,373 $6,979
UC2506 #02 Y:2025 Install occupancy sensors $1,938 $3,780
UC2506 #01 Y:2025 Change rate schedules or other changes in utility service $26,750 -
IP0182 #05 Y:2023 Replace existing hvac unit with high efficiency model $1,173 $6,828
IP0182 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $950 $1,284
IP0182 #03 Y:2023 Install occupancy sensors $203 $172
IP0182 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,891 $50
IP0182 #01 Y:2023 Reduce the pressure of compressed air to the minimum required $3,142 -
CC0017 #06 Y:2023 Use solar heat to make electricty $139,613 $1,192,963
CC0017 #05 Y:2023 Make a practice of turning off lights when not needed $1,525 -
CC0017 #04 Y:2023 Install occupancy sensors $4,836 $6,196
CC0017 #03 Y:2023 Turn off equipment when not in use $6,445 -
CC0017 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $3,997 $8,484
CC0017 #01 Y:2023 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $90,004 -
IC0273 #05 Y:2022 Use solar heat to make electricty $279,174 $2,543,426