Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

361

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle transmission and power train parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0045 #14 Y:2024 Pay bills on time to avoid late fees $4,768 -
MU0045 #13 Y:2024 Minimize water usage $60,609 $146,420
MU0045 #12 Y:2024 Minimize water usage $25,914 $8,239
MU0045 #11 Y:2024 Install partitions to reduce size of conditioned space $1,256 $1,302
MU0045 #10 Y:2024 Use proper thickness of insulation on building envelope $5,014 $4,165
MU0045 #09 Y:2024 Install vinyl strip / high speed / air curtain doors $38,860 $12,105
MU0045 #08 Y:2024 Lower temperature during the winter season and vice-versa $2,871 -
MU0045 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,694 $706
MU0045 #06 Y:2024 Turn off equipment when not in use $5,088 -
MU0045 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,606 $17
MU0045 #04 Y:2024 Use or replace with energy efficient substitutes $7,936 $18,703
MU0045 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $31,005 $34,270
MU0045 #02 Y:2024 Optimize plant power factor $14,981 $56,840
MU0045 #01 Y:2024 Recharge batteries on during off-peak demand periods $1,629 -
GT0977 #05 Y:2024 Use solar heat to make electricty $72,598 $1,299,381
GT0977 #04 Y:2024 Turn off equipment during breaks, reduce operating time $6,327 $12,892
GT0977 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $15,128 $14,000
GT0977 #02 Y:2024 Turn off equipment when not in use $1,957 $1,500
GT0977 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $85,518 $1,850
UD1083 #09 Y:2024 Install occupancy sensors $2,220 $1,846