Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

377

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle transmission and power train parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0093 #08 Y:2026 Improve air circulation with destratification fans / other methods $2,977 $9,800
MU0093 #07 Y:2026 Lower temperature during the winter season and vice-versa $10,693 -
MU0093 #06 Y:2026 Install occupancy sensors $117 $426
MU0093 #05 Y:2026 Use photocell controls $463 $29
MU0093 #04 Y:2026 Install compressor air intakes in coolest locations $1,196 $1,922
MU0093 #03 Y:2026 Install / repair insulation on steam lines $87 $45
MU0093 #02 Y:2026 Apply for tax-free status for energy purchases $15,088 -
MU0093 #01 Y:2026 Use solar heat to make electricty $34,403 $414,720
TT0323 #08 Y:2024 Use solar heat for heat $26,365 $221,500
TT0323 #07 Y:2024 Air condition only space necessary $12,931 $18,000
TT0323 #06 Y:2024 Utilize outside contracting $27,937 $30,000
TT0323 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $2,604 $2,430
TT0323 #04 Y:2024 Eliminate or reduce compressed air usage $315 $180
TT0323 #03 Y:2024 Utilize controls to operate equipment only when needed $1,028 $400
TT0323 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $8,234 $2,520
TT0323 #01 Y:2024 Turn off equipment when not in use $451 -
MU0045 #14 Y:2024 Pay bills on time to avoid late fees $4,768 -
MU0045 #13 Y:2024 Minimize water usage $60,609 $146,420
MU0045 #12 Y:2024 Minimize water usage $25,914 $8,239
MU0045 #11 Y:2024 Install partitions to reduce size of conditioned space $1,256 $1,302