Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle transmission and power train parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0339 #12 Y:2013 Conserve energy by efficient use of vending machines $381 $1,312
SU0339 #11 Y:2013 Use waste heat from hot flue gases to preheat $6,108 $20,639
SU0339 #10 Y:2013 Keep doors and windows shut when not on use $716 $1,567
SU0339 #09 Y:2013 Eliminate/reduce an operation $13,535 $19,680
SU0339 #08 Y:2013 Reduce illumination to minimum necessary levels $35,885 $54,000
SU0339 #07 Y:2013 Install occupancy sensors $2,294 $2,093
SU0339 #06 Y:2013 Reduce ventilation air $1,471 $882
SU0339 #05 Y:2013 Add area lighting switches $429 $152
SU0339 #04 Y:2013 Keep doors and windows shut when not on use $18,079 $3,600
SU0339 #03 Y:2013 Close holes and openings in building such as broken windows $1,064 $125
SU0339 #02 Y:2013 Install compressor air intakes in coolest locations $10,664 $994
SU0339 #01 Y:2013 Install spectral reflectors / delamp $4,610 -
SU0319 #09 Y:2012 Optimize plant power factor $21,253 $79,288
SU0319 #08 Y:2012 Conserve energy by efficient use of vending machines $503 $1,805
SU0319 #07 Y:2012 Recover waste heat from equipment $250,480 $603,880
SU0319 #06 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,147 $1,075
SU0319 #05 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $3,410 $2,500
SU0319 #04 Y:2012 Eliminate/reduce an operation $24,117 $15,840
SU0319 #03 Y:2012 Install compressor air intakes in coolest locations $13,648 $1,000
SU0319 #02 Y:2012 Conserve energy by efficient use of vending machines $17 -