Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

256

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle electrical and electronic equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UK2101 #13 Y:2021 Use solar heat to make electricty $171,872 $1,684,348
UK2101 #12 Y:2021 Combine utility meters $72,182 $150,000
UK2101 #11 Y:2021 Turn off equipment when not in use $1,883 -
UK2101 #10 Y:2021 Preheat combustion air with waste heat $4,968 $15,000
UK2101 #09 Y:2021 Utilize higher efficiency lamps and/or ballasts $5,735 $6,438
UK2101 #08 Y:2021 Install occupancy sensors $783 $2,210
UK2101 #07 Y:2021 Reduce illumination to minimum necessary levels $32,159 $7,382
UK2101 #06 Y:2021 Keep doors and windows shut when not on use $16,094 $170
UK2101 #05 Y:2021 Recover waste heat from equipment $6,495 $2,215
UK2101 #04 Y:2021 Install compressor air intakes in coolest locations $8,953 $2,145
UK2101 #03 Y:2021 Eliminate or reduce compressed air usage $102,514 $43,405
UK2101 #02 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $68,186 $12,380
UK2101 #01 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $11,574 $6,800
TT0249 #07 Y:2021 Minimize water usage $846 $1,753
TT0249 #06 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $1,717 $5,000
TT0249 #05 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,071 $325
TT0249 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $11,133 $1,500
TT0249 #03 Y:2021 Optimize plant power factor $17,343 $140,000
TT0249 #02 Y:2021 Use solar heat for heat $66,558 $342,530
TT0249 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $87,163 $208,768