Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

256

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle electrical and electronic equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1126 #03 Y:2025 Pay utility bills on time $2,991 -
UD1126 #02 Y:2025 Meter recycled water (to reduce sewer charges) $9,848 $2,500
UD1126 #01 Y:2025 Change rate schedules or other changes in utility service $32,372 -
UD1125 #05 Y:2025 Install occupancy sensors $1,480 $1,208
UD1125 #04 Y:2025 Reduce space conditioning during non-working hours $57,613 $3,735
UD1125 #03 Y:2025 Eliminate or reduce compressed air usage $4,431 -
UD1125 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $20,992 $953
UD1125 #01 Y:2025 Pay utility bills on time $11,153 -
TT0346 #10 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $20,815 $5,200
TT0346 #09 Y:2025 Recover waste heat from equipment $8,477 $5,000
TT0346 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,647 $810
TT0346 #07 Y:2025 Reduce the pressure of compressed air to the minimum required $11,473 $16,500
TT0346 #06 Y:2025 Use solar heat for heat $55,780 $305,370
TT0346 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $35,242 $92,000
TT0346 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,686 $375
TT0346 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $12,990 $1,615
TT0346 #02 Y:2025 Initiate a program to acquire iso certification $17,037 $20,000
TT0346 #01 Y:2025 Apply for tax-free status for energy purchases $23,167 -
MU0075 #14 Y:2025 Pay bills on time to avoid late fees $388 -
MU0075 #13 Y:2025 Close holes and openings in building such as broken windows $659 $513