Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle electrical and electronic equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0283 #09 Y:2005 Utilize higher efficiency lamps and/or ballasts $401 $1,066
MS0283 #08 Y:2005 Install occupancy sensors $402 $556
MS0283 #07 Y:2005 Install vinyl strip / high speed / air curtain doors $1,316 $2,025
MS0283 #06 Y:2005 Lower temperature during the winter season and vice-versa $1,320 $236
MS0283 #05 Y:2005 Utilize energy-efficient belts and other improved mechanisms $1,965 $3,192
MS0283 #04 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $3,338 $247
MS0283 #03 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $18,008 $50,375
MS0283 #02 Y:2005 Utilize higher efficiency lamps and/or ballasts $32,662 $81,973
MS0283 #01 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $42,251 $69,379
MS0255 #08 Y:2004 Combine utility meters $174 $50
MS0255 #07 Y:2004 Air condition only space necessary $1,768 $600
MS0255 #06 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $3,953 $8,984
MS0255 #05 Y:2004 Make a practice of turning off lights when not needed $5,775 $4,524
MS0255 #04 Y:2004 Utilize energy-efficient belts and other improved mechanisms $6,343 $2,164
MS0255 #03 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $7,202 $372
MS0255 #02 Y:2004 Install compressor air intakes in coolest locations $7,517 $2,756
MS0255 #01 Y:2004 Utilize higher efficiency lamps and/or ballasts $14,124 $23,073