ITAC Assessment: MS0283
ITAC logo
ITAC Assessment: MS0283
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Electrical Equipment
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 203,072
ft2
Annual Production 448,794,646
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,013,802 24,701,292
kWh
Electricity Demand $167,085 45,850
kW-mo/yr
Electricity Fees $500,000 -
Natural Gas $5,444 500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,663 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,346

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $42,251 $69,379 $27,708
831,379
kWh
- $14,543
02 2.7142: Utilize higher efficiency lamps and/or ballasts $32,662 $81,973 $19,289
578,756
kWh
$2,965
-
kW-mo/yr
$10,408
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,008 $50,375 $10,964
328,986
kWh
$1,176
-
kW-mo/yr
$5,868
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,338 $247 $2,189
65,682
kWh
- $1,149
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,965 $3,192 $1,097
32,930
kWh
$266
-
kW-mo/yr
$602
06 2.7221: Lower temperature during the winter season and vice-versa $1,320 $236 $865
25,966
kWh
- $455
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,316 $2,025 $863
25,899
kWh
- $453
08 2.7135: Install occupancy sensors $402 $556 $264
7,918
kWh
- $138
09 2.7142: Utilize higher efficiency lamps and/or ballasts $401 $1,066 $230
6,900
kWh
$46
-
kW-mo/yr
$125
TOTAL RECOMMENDED $101,663 $209,049 $63,469
1,904,416
kWh
$4,453
-
kW-mo/yr
$33,741
TOTAL IMPLEMENTED $21,346 $50,622 $13,153
394,668
kWh
$1,176
-
kW-mo/yr
$7,017
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs