Assessment Year | 2005 |
---|---|
Principal Product | Electrical Equipment |
NAICS | 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
203,072
ft2
|
Annual Production | 448,794,646
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,013,802 | 24,701,292 |
kWh
|
$0.041 |
Electricity Demand | $167,085 | 45,850 |
kW-mo/yr
|
$3.64 |
Electricity Fees | $500,000 | - |
|
- |
Natural Gas | $5,444 | 500 |
MMBtu
|
$10.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $101,663 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,346 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $42,251 | $69,379 |
$27,708
831,379
kWh
|
- | $14,543 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,662 | $81,973 |
$19,289
578,756
kWh
|
$2,965
-
kW-mo/yr
|
$10,408 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,008 | $50,375 |
$10,964
328,986
kWh
|
$1,176
-
kW-mo/yr
|
$5,868 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,338 | $247 |
$2,189
65,682
kWh
|
- | $1,149 | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,965 | $3,192 |
$1,097
32,930
kWh
|
$266
-
kW-mo/yr
|
$602 | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $1,320 | $236 |
$865
25,966
kWh
|
- | $455 | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,316 | $2,025 |
$863
25,899
kWh
|
- | $453 | |
08 | 2.7135: Install occupancy sensors | $402 | $556 |
$264
7,918
kWh
|
- | $138 | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $401 | $1,066 |
$230
6,900
kWh
|
$46
-
kW-mo/yr
|
$125 | |
TOTAL RECOMMENDED | $101,663 | $209,049 |
$63,469
1,904,416
kWh
|
$4,453
-
kW-mo/yr
|
$33,741 | ||
TOTAL IMPLEMENTED | $21,346 | $50,622 |
$13,153
394,668
kWh
|
$1,176
-
kW-mo/yr
|
$7,017 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs