Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

14

matching recommendations
$
$
ARC Waste minimization / pollution prevention
NAICS Motor vehicle gasoline engine and engine parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0093 #01 Y:2024 Separate and recycle scrap metal to foundry or for sale $98,059 $3,032
NL0065 #03 Y:2022 Recover and reuse cooling water $66,179 $102,065
TT0205 #03 Y:2018 Meter waste water $30,463 $1,000
IP0084 #13 Y:2017 Eliminate leaks in water lines and valves $446 $1,250
NC0522 #11 Y:2014 Use closed cycle process to minimize waste water production $971 $3,500
NC0522 #01 Y:2014 Recover and reuse cooling water $3,379 $6,500
UM0291 #02 Y:2005 Use closed cycle process to minimize waste water production $18,138 $19,073
GT0810 #02 Y:2005 Recover and reuse waste material $20,000 -
GT0810 #01 Y:2005 Separate and recycle scrap metal to foundry or for sale $30,000 -
MS0260 #03 Y:2004 Minimize water usage $9,057 $107
UM0260 #02 Y:2004 Use closed cycle process to minimize waste water production $33,620 $12,000
UD0682 #03 Y:2003 Meter recycled water (to reduce sewer charges) $21,300 $11,000
UD0680 #03 Y:2003 Use closed cycle process to minimize waste water production $9,824 $2,160
UD0678 #10 Y:2003 Meter recycled water (to reduce sewer charges) $2,251 $2,000