ITAC Assessment: NL0093
ITAC logo
ITAC Assessment: NL0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Valves and Gears
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 320,000
ft2
Annual Production 350,000,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,030,904 57,237,104
kWh
Electricity Demand $1,279,520 106,800
kW-mo/yr
Electricity Fees $375,516 -
Natural Gas $874,428 134,577
MMBtu
Waste Disposal Costs
Water Usage $2,679 20,809
Tgal
Water Disposal $59,468 20,809
Tgal
Solid Waste (non-haz) $89,368 2,100,000
lb
TOTAL YEARLY COSTS $4,711,883
RECOMMENDED SAVINGS* $487,334 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings By-product Production Savings Increase in Production Savings
01 3.5248: Separate and recycle scrap metal to foundry or for sale $98,059 $3,032 - - - $44,684
-
lb
- - $(-25,375.0) $78,750 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $89,480 $25,000 $90,793
2,594,085
kWh
- - - $(-1,213.0) $(-100.0) - - -
03 2.4239: Eliminate or reduce compressed air usage $85,617 $14,590 $85,617
2,446,208
kWh
- - - - - - - -
04 2.8121: Apply for tax-free status for energy purchases $48,320 $758 - - - - - - $48,320 - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $37,905 $304,251 $17,264
493,258
kWh
$8,096
-
kW-mo/yr
- - $12,545 - - - -
06 2.4239: Eliminate or reduce compressed air usage $26,827 $11,637 $26,827
766,472
kWh
- - - - - - - -
07 2.7243: Improve air circulation with destratification fans / other methods $26,319 $63,700 $1,355
38,724
kWh
$664
-
kW-mo/yr
- - - - - - $24,300
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,160 $15,000 $26,160
747,421
kWh
- - - - - - - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $22,919 $17,059 $15,043
429,788
kWh
$7,876
-
kW-mo/yr
- - - - - - -
10 2.4221: Install compressor air intakes in coolest locations $14,300 $12,229 $14,300
408,573
kWh
- - - - - - - -
11 2.3132: Recharge batteries on during off-peak demand periods $4,437 $379 - $4,437
-
kW-mo/yr
- - - - - - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $2,480 $5,721 $1,126
32,179
kWh
$918
-
kW-mo/yr
- - $436 - - - -
13 2.7231: Use radiant heater for spot heating $2,101 $6,000 - - $2,101
-
MMBtu
- - - - - -
14 2.7135: Install occupancy sensors $1,781 $798 $1,781
50,868
kWh
- - - - - - - -
15 2.7142: Utilize higher efficiency lamps and/or ballasts $629 $818 $154
4,415
kWh
$73
-
kW-mo/yr
- - $402 - - - -
TOTAL RECOMMENDED $487,334 $480,972 $280,420
8,011,991
kWh
$22,064
-
kW-mo/yr
$2,101
-
MMBtu
$44,684
-
lb
$12,170 $(-100.0) $22,945 $78,750 $24,300
TOTAL IMPLEMENTED - - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings By-product Production Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs