Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,691

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0312 #09 Y:2026 Recover waste heat from equipment $5,403 $8,397
UA0312 #08 Y:2026 Improve air circulation with destratification fans / other methods $16,043 $55,305
UA0312 #07 Y:2026 Reduce heat gain by window tinting $1,938 $2,695
UA0312 #06 Y:2026 Replace existing hvac unit with high efficiency model $41,479 $259,458
UA0312 #05 Y:2026 Use solar heat to make electricty $240,021 $3,134,000
UA0312 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,920 $2,438
UA0312 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $329 $988
UA0312 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $1,304 $250
UA0312 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,968 $8,591
TR0079 #05 Y:2026 Use solar heat to make electricty $138,084 $365,341
TR0079 #04 Y:2026 Install compressor air intakes in coolest locations $1,173 $615
TR0079 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,510 $3,924
TR0079 #02 Y:2026 Use or replace with energy efficient substitutes $10,784 $27,400
TR0079 #01 Y:2026 Begin a practice of predictive / preventative maintenance $10,400 $1,650
UD1141 #08 Y:2026 Meter recycled water (to reduce sewer charges) $18,123 $2,500
UD1141 #07 Y:2026 Optimize plant power factor $78,726 $82,652
UD1141 #06 Y:2026 Eliminate or reduce compressed air usage $7,415 $16,650
UD1141 #05 Y:2026 Install compressor air intakes in coolest locations $34,953 $6,400
UD1141 #04 Y:2026 Install motor voltage controller on lightly loaded motors $4,932 $4,034
UD1141 #03 Y:2026 Minimize operation of equipment maintained in standby condition $5,189 -