Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,607

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0308 #09 Y:2026 Utilize energy-efficient belts and other improved mechanisms $838 $1,931
UA0308 #08 Y:2026 Use solar heat to make electricty $71,695 $919,800
UA0308 #07 Y:2026 Reduce illumination to minimum necessary levels $164 $231
UA0308 #06 Y:2026 Install occupancy sensors $1,998 $4,339
UA0308 #05 Y:2026 Improve air circulation with destratification fans / other methods $1,361 $541
UA0308 #04 Y:2026 Install timers and/or thermostats $13,733 $1,216
UA0308 #03 Y:2026 Replace existing hvac unit with high efficiency model $71,801 $230,861
UA0308 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,128 $6,591
UA0308 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $9,809 $1,000
WM0259 #05 Y:2026 Install spectral reflectors / delamp $265 -
WM0259 #04 Y:2026 Install adequate dryers on air lines to eliminate blowdown $1,514 $1,508
WM0259 #03 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $24,491 $20,000
WM0259 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $46,427 $10,000
WM0259 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $134,432 -
UC2601 #10 Y:2026 Optimize plant power factor $8,766 $30,464
UC2601 #09 Y:2026 Make a practice of turning off lights when not needed $4,711 -
UC2601 #08 Y:2026 Install occupancy sensors $12,838 $3,840
UC2601 #07 Y:2026 Insulate bare equipment $11,998 $7,750
UC2601 #06 Y:2026 Replace existing chiller with high efficiency model $60,580 $184,500
UC2601 #05 Y:2026 Use or replace with energy efficient substitutes $2,654 $20,000