Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Heavy duty truck manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0445 #07 Y:2025 Use / purchase optimum sized compressor $27,723 $35,999
MS0445 #06 Y:2025 Use optimum size and capacity equipment $5,573 $2,502
MS0445 #05 Y:2025 Level zero – install control systems for existing equipment $12,178 $45,000
MS0445 #04 Y:2025 Air condition only space necessary $40,482 $25,536
MS0445 #03 Y:2025 Change rate schedules or other changes in utility service $395 -
MS0445 #02 Y:2025 Use properly designed and sized hvac equipment $8,629 $44,500
MS0445 #01 Y:2025 Replace fossil fuel equipment with electrical equipment $17,535 $200,000
WV0654 #17 Y:2023 Reduce the pressure of compressed air to the minimum required $176 $240
WV0654 #16 Y:2023 Insulate bare equipment $190 $98
WV0654 #15 Y:2023 Install compressor air intakes in coolest locations $226 $970
WV0654 #14 Y:2023 Develop a repair/replace policy $282 $1,370
WV0654 #13 Y:2023 Establish a predictive maintenance program $493 $1,500
WV0654 #12 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $554 $150
WV0654 #11 Y:2023 Change product design to reduce energy requirements $612 $1,300
WV0654 #10 Y:2023 Utilize energy-efficient belts and other improved mechanisms $648 $3,230
WV0654 #09 Y:2023 Replace fossil fuel equipment with electrical equipment $951 $330
WV0654 #08 Y:2023 Analyze flue gas for proper air/fuel ratio $1,093 $1,113
WV0654 #07 Y:2023 Utilize a less expensive cooling method $1,242 $6,000
WV0654 #06 Y:2023 Use flue gases to heat process or service water $1,462 $5,940
WV0654 #05 Y:2023 Upgrade controls on compressors $3,551 $9,700