Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

162

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Heavy duty truck manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0654 #17 Y:2023 Reduce the pressure of compressed air to the minimum required $176 $240
WV0654 #16 Y:2023 Insulate bare equipment $190 $98
WV0654 #15 Y:2023 Install compressor air intakes in coolest locations $226 $970
WV0654 #14 Y:2023 Develop a repair/replace policy $282 $1,370
WV0654 #13 Y:2023 Establish a predictive maintenance program $493 $1,500
WV0654 #12 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $554 $150
WV0654 #11 Y:2023 Change product design to reduce energy requirements $612 $1,300
WV0654 #10 Y:2023 Utilize energy-efficient belts and other improved mechanisms $648 $3,230
WV0654 #09 Y:2023 Replace fossil fuel equipment with electrical equipment $951 $330
WV0654 #08 Y:2023 Analyze flue gas for proper air/fuel ratio $1,093 $1,113
WV0654 #07 Y:2023 Utilize a less expensive cooling method $1,242 $6,000
WV0654 #06 Y:2023 Use flue gases to heat process or service water $1,462 $5,940
WV0654 #05 Y:2023 Upgrade controls on compressors $3,551 $9,700
WV0654 #04 Y:2023 Install vinyl strip / high speed / air curtain doors $5,126 $9,645
WV0654 #03 Y:2023 Reduce ventilation air $5,594 $13,814
WV0654 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $6,126 $3,800
WV0654 #01 Y:2023 Reduce space conditioning during non-working hours $12,942 $63,000
WV0641 #09 Y:2023 Insulate bare equipment $402 $758
WV0641 #08 Y:2023 Analyze flue gas for proper air/fuel ratio $917 $933
WV0641 #07 Y:2023 Install vinyl strip / high speed / air curtain doors $1,857 $5,425