Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other miscellaneous electrical equipment and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CW0130 #06 Y:2023 Use solar heat to make electricty $1,786 $6,750
CW0130 #05 Y:2023 Re-size charging openings or add movable cover or door $7,210 $13,000
CW0130 #04 Y:2023 Close holes and openings in building such as broken windows $202 $424
CW0130 #03 Y:2023 Insulate glazing, walls, ceilings, and roofs $17,298 $8,391
CW0130 #02 Y:2023 Install occupancy sensors $4,196 $2,050
CW0130 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $4,562 $17,397
SU0532 #10 Y:2023 Install compressor air intakes in coolest locations $728 -
SU0532 #09 Y:2023 Install vinyl strip / high speed / air curtain doors $24 $100
SU0532 #08 Y:2023 Reschedule plant operations or reduce load to avoid peaks $1,165 -
SU0532 #07 Y:2023 Install occupancy sensors $827 $580
SU0532 #06 Y:2023 Utilize higher efficiency lamps and/or ballasts $9,953 $8,568
SU0532 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,119 $2,000
SU0532 #04 Y:2023 Apply for tax-free status for energy purchases $6,803 -
SU0532 #03 Y:2023 Eliminate or reduce compressed air usage $1,864 -
SU0532 #02 Y:2023 Pay bills on time to avoid late fees $1,177 -
SU0532 #01 Y:2023 Disconnect ballasts $6,186 -
WV0645 #09 Y:2023 Develop a repair/replace policy $182 $646
WV0645 #08 Y:2023 Reduce the pressure of compressed air to the minimum required $367 $219
WV0645 #07 Y:2023 Eliminate or reduce compressed air usage $517 $1,081
WV0645 #06 Y:2023 Install vinyl strip / high speed / air curtain doors $540 $1,161