Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

183

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other miscellaneous electrical equipment and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0111 #06 Y:2025 Apply for tax-free status for energy purchases $471 $416
NL0111 #05 Y:2025 Meter waste water $564 $1,582
NL0111 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $771 $26
NL0111 #03 Y:2025 Reschedule plant operations or reduce load to avoid peaks $2,457 $104
NL0111 #02 Y:2025 Install efficient rectifiers $9,857 $75,000
NL0111 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $20,339 $29,931
UC2505 #09 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,294 $852
UC2505 #08 Y:2025 Apply for tax-free status for energy purchases $10,963 -
UC2505 #07 Y:2025 Use solar heat to make electricty $55,106 $495,624
UC2505 #06 Y:2025 Replace existing hvac unit with high efficiency model $9,529 $63,000
UC2505 #05 Y:2025 Install timers and/or thermostats $1,138 $1,140
UC2505 #04 Y:2025 Use cooling tower water instead of refrigeration $39,288 $50,000
UC2505 #03 Y:2025 Keep doors and windows shut when not on use $4,253 $2,096
UC2505 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $8,438 $75
UC2505 #01 Y:2025 Recover waste heat from equipment $2,475 $1,500
CW0130 #06 Y:2023 Use solar heat to make electricty $1,786 $6,750
CW0130 #05 Y:2023 Re-size charging openings or add movable cover or door $7,210 $13,000
CW0130 #04 Y:2023 Close holes and openings in building such as broken windows $202 $424
CW0130 #03 Y:2023 Insulate glazing, walls, ceilings, and roofs $17,298 $8,391
CW0130 #02 Y:2023 Install occupancy sensors $4,196 $2,050