ITAC Assessment: CW0130
ITAC logo
ITAC Assessment: CW0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Refurbishment of Battery Modules
NAICS 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 168
Plant Area 114,880
ft2
Annual Production 10,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,624 1,527,158
kWh
Natural Gas $35,154 4,418
MMBtu
Waste Disposal Costs
Water Usage $1,812 111
Tgal
TOTAL YEARLY COSTS $108,589
RECOMMENDED SAVINGS* $35,255 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,562 $17,397 $4,562
97,281
kWh
-
02 2.7135: Install occupancy sensors $4,196 $2,050 $4,196
89,461
kWh
-
03 2.7491: Insulate glazing, walls, ceilings, and roofs $17,298 $8,391 - $17,298
-
MMBtu
04 2.7444: Close holes and openings in building such as broken windows $202 $424 - $202
-
MMBtu
05 2.2531: Re-size charging openings or add movable cover or door $7,210 $13,000 $(-37.1)
(-792)
kWh
$7,247
-
MMBtu
06 2.9114: Use solar heat to make electricty $1,786 $6,750 $1,786
38,086
kWh
-
TOTAL RECOMMENDED $35,255 $48,012 $10,507
224,036
kWh
$24,748
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs