Assessment Year | 2018 |
---|---|
Principal Product | Structural Aircraft Parts |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 100 |
Plant Area |
200,000
ft2
|
Annual Production | 6,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $168,470 | 3,973,028 |
kWh
|
$0.042 |
Electricity Demand | $168,361 | 7,908 |
kW-mo/yr
|
$21.29 |
Natural Gas | $13,936 | 1,973 |
MMBtu
|
$7.06 |
TOTAL YEARLY COSTS | $350,767 | |||
RECOMMENDED SAVINGS* | $84,947 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,265 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,265 | $25,906 |
$20,172
480,289
kWh
|
$12,093
-
kW-mo/yr
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,485 | $22,966 |
$18,485
440,126
kWh
|
- | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $18,799 | $9,162 | - |
$18,799
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,536 | $2,095 |
$8,536
203,232
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,396 | - |
$2,396
57,038
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $4,466 | $610 |
$2,635
62,746
kWh
|
$1,831
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $84,947 | $60,739 |
$52,224
1,243,431
kWh
|
$32,723
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $32,265 | $25,906 |
$20,172
480,289
kWh
|
$12,093
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs