Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fiber optic cable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0575 #06 Y:2016 Eliminate or reduce compressed air usage $158 $300
NC0575 #05 Y:2016 Install compressor air intakes in coolest locations $338 $100
NC0575 #04 Y:2016 Reduce illumination to minimum necessary levels $750 $475
NC0575 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $10,862 $21,540
NC0575 #02 Y:2016 Change rate schedules or other changes in utility service $4,087 $100
NC0575 #01 Y:2016 Change rate schedules or other changes in utility service $7,250 $500
NC0571 #10 Y:2016 Develop a repair/replace policy $3,097 $5,685
NC0571 #09 Y:2016 Recharge batteries on during off-peak demand periods $1,454 $200
NC0571 #08 Y:2016 Eliminate or reduce compressed air usage $12,346 $12,000
NC0571 #07 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $3,705 $200
NC0571 #06 Y:2016 Install occupancy sensors $2,140 $2,603
NC0571 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $2,338 $11,069
NC0571 #04 Y:2016 Utilize higher efficiency lamps and/or ballasts $4,882 $16,830
NC0571 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $13,239 $20,540
NC0571 #02 Y:2016 Utilize higher efficiency lamps and/or ballasts $57,529 $69,600
NC0571 #01 Y:2016 Change rate schedules or other changes in utility service $59,225 $500
NC0371 #11 Y:2007 Develop a repair/replace policy $5,688 $13,149
NC0371 #10 Y:2007 Adopt in-house material generation $28,534 $85,000
NC0371 #09 Y:2007 Insulate bare equipment $288 $485
NC0371 #08 Y:2007 Reschedule plant operations or reduce load to avoid peaks $998 -