IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Fiber optic cables
NAICS 335921: Fiber Optic Cable Manufacturing
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 55,000
ft2
Annual Production 800,000
units
Production Hrs. Annual 3,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,157 498,881
kWh
Electricity Demand $27,694 2,400
kW-mo/yr
Natural Gas $4,081 565
MMBtu
TOTAL YEARLY COSTS $54,932
RECOMMENDED SAVINGS* $23,445 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,087

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $7,250 $500 - $7,250
-
kW-mo/yr
-
02 2.8114: Change rate schedules or other changes in utility service $4,087 $100 $(-10,875.0)
-
kWh
$14,962
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,862 $21,540 $5,239
112,917
kWh
$4,014
-
kW-mo/yr
$1,609
04 2.7111: Reduce illumination to minimum necessary levels $750 $475 $384
8,280
kWh
$319
-
kW-mo/yr
$47
05 2.4221: Install compressor air intakes in coolest locations $338 $100 $252
5,431
kWh
$86
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $158 $300 $158
3,399
kWh
- -
TOTAL RECOMMENDED $23,445 $23,015 $(-4,842.0)
130,027
kWh
$26,631
-
kW-mo/yr
$1,656
TOTAL IMPLEMENTED $12,087 $1,075 $(-10,491.0)
8,280
kWh
$22,531
-
kW-mo/yr
$47
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings