Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fiber optic cable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0261 #09 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $703 $850
TT0261 #08 Y:2021 Reduce space conditioning during non-working hours $2,221 $9,600
TT0261 #07 Y:2021 Use / purchase optimum sized compressor $5,374 -
TT0261 #06 Y:2021 Utilize energy-efficient belts and other improved mechanisms $6,718 $15,000
TT0261 #05 Y:2021 Reduce the pressure of compressed air to the minimum required $9,133 $3,000
TT0261 #04 Y:2021 Turn off equipment when not in use $26,082 $700
TT0261 #03 Y:2021 Install outside air damper / economizer on hvac unit $30,912 $38,200
TT0261 #02 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $49,358 $3,200
TT0261 #01 Y:2021 Clean or color roof to reduce solar load $188,912 $733,702
NC0575 #06 Y:2016 Eliminate or reduce compressed air usage $158 $300
NC0575 #05 Y:2016 Install compressor air intakes in coolest locations $338 $100
NC0575 #04 Y:2016 Reduce illumination to minimum necessary levels $750 $475
NC0575 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $10,862 $21,540
NC0575 #02 Y:2016 Change rate schedules or other changes in utility service $4,087 $100
NC0575 #01 Y:2016 Change rate schedules or other changes in utility service $7,250 $500
NC0571 #10 Y:2016 Develop a repair/replace policy $3,097 $5,685
NC0571 #09 Y:2016 Recharge batteries on during off-peak demand periods $1,454 $200
NC0571 #08 Y:2016 Eliminate or reduce compressed air usage $12,346 $12,000
NC0571 #07 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $3,705 $200
NC0571 #06 Y:2016 Install occupancy sensors $2,140 $2,603