ITAC Assessment: TT0261
ITAC logo
ITAC Assessment: TT0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Wire and Cable
NAICS 335921: Fiber Optic Cable Manufacturing
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $50
M
to 100
M
# of Employees 109
Plant Area 182,859
ft2
Annual Production 421,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $626,303 10,069,880
kWh
Electricity Demand $241,357 21,268
kW-mo/yr
Natural Gas $9,812 1,328
MMBtu
Waste Disposal Costs
Water Usage $9,597 38,656
Tgal
Water Disposal $22,620 38,656
Tgal
TOTAL YEARLY COSTS $909,689
RECOMMENDED SAVINGS* $319,413 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $269,726

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7425: Clean or color roof to reduce solar load $188,912 $733,702 $51,499
827,960
kWh
$269
-
kW-mo/yr
$137,144
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $49,358 $3,200 $36,163
581,400
kWh
$13,195
-
kW-mo/yr
-
03 2.7241: Install outside air damper / economizer on hvac unit $30,912 $38,200 $30,912
496,973
kWh
- -
04 2.6218: Turn off equipment when not in use $26,082 $700 $26,082
419,328
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $9,133 $3,000 $8,669
139,370
kWh
$464
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,718 $15,000 $6,718
108,006
kWh
- -
07 2.4226: Use / purchase optimum sized compressor $5,374 - $4,250
68,550
kWh
$1,124
-
kW-mo/yr
-
08 2.7224: Reduce space conditioning during non-working hours $2,221 $9,600 $2,221
35,703
kWh
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $703 $850 $515
8,280
kWh
$188
-
kW-mo/yr
-
TOTAL RECOMMENDED $319,413 $804,252 $167,029
2,685,570
kWh
$15,240
-
kW-mo/yr
$137,144
TOTAL IMPLEMENTED $269,726 $737,602 $117,994
1,897,238
kWh
$14,588
-
kW-mo/yr
$137,144
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs