1,064
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
OK1133 #07 Y:2024 | 07 | 2024 | Conserve energy by efficient use of vending machines | $819 | $480 |
n/a
|
OK1133 #06 Y:2024 | 06 | 2024 | Use radiant heater for spot heating | $10,095 | $25,179 |
n/a
|
OK1133 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $10,253 | $7,180 |
n/a
|
OK1133 #04 Y:2024 | 04 | 2024 | Install sub-metering equipment | $677 | $990 |
n/a
|
OK1133 #03 Y:2024 | 03 | 2024 | Optimize plant power factor | $5,711 | $4,416 |
n/a
|
OK1133 #02 Y:2024 | 02 | 2024 | Use solar heat to make electricty | $23,461 | $163,800 |
n/a
|
OK1133 #01 Y:2024 | 01 | 2024 | Utilize higher efficiency lamps and/or ballasts | $878 | $1,370 |
n/a
|
GT0988 #06 Y:2024 | 06 | 2024 | Use solar heat to make electricty | $91,923 | $962,674 |
n/a
|
GT0988 #05 Y:2024 | 05 | 2024 | Optimize plant power factor | $10,998 | $47,093 |
n/a
|
GT0988 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $598 | $200 |
n/a
|
GT0988 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $18,172 | $1,850 |
n/a
|
GT0988 #02 Y:2024 | 02 | 2024 | Chill water to the highest temperature possible | $5,947 | $400 |
n/a
|
GT0988 #01 Y:2024 | 01 | 2024 | Apply for tax-free status for energy purchases | $14,344 | $800 |
n/a
|
CI0036 #07 Y:2024 | 07 | 2024 | Replace fossil fuel equipment with electrical equipment | $1,361 | $8,000 |
n/a
|
CI0036 #06 Y:2024 | 06 | 2024 | Recharge batteries on during off-peak demand periods | $6,300 | $80 |
n/a
|
CI0036 #05 Y:2024 | 05 | 2024 | Recover waste heat from equipment | $36,628 | $24,000 |
n/a
|
CI0036 #04 Y:2024 | 04 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $54,033 | $1,200 |
n/a
|
CI0036 #03 Y:2024 | 03 | 2024 | Use solar heat to make electricty | $101,553 | $493,100 |
n/a
|
CI0036 #02 Y:2024 | 02 | 2024 | Replace fossil fuel equipment with electrical equipment | $209,556 | $50,000 |
n/a
|
CI0036 #01 Y:2024 | 01 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $400,041 | $153,000 |
n/a
|