ITAC Assessment: UC2610
ITAC logo
ITAC Assessment: UC2610
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product EVSE equipment, Busbar systems, new and retrofit
NAICS 541330: Engineering Services
SIC 8711: Engineering Services
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area 40,000
ft2
Annual Production 3,500
units
Production Hrs. Annual 2,000
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,853 168,300
kWh
Electricity Demand $15,581 812
kW-mo/yr
Electricity Fees $3,713 -
LPG $21,536 900
MMBtu
TOTAL YEARLY COSTS $70,683
RECOMMENDED SAVINGS* $28,095 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Personnel Changes Savings
01 2.8123: Pay utility bills on time $380 - - - $380 - -
02 2.7212: Install or upgrade insulation on hvac distribution systems $278 $650 $33
187
kWh
- - $245
-
MMBtu
-
03 2.7135: Install occupancy sensors $199 $1,000 $171
966
kWh
$28
-
kW-mo/yr
- - -
04 4.712: Utilize job costing software $27,238 $10,000 - - - - $27,238
TOTAL RECOMMENDED $28,095 $11,650 $204
1,153
kWh
$28
-
kW-mo/yr
$380 $245
-
MMBtu
$27,238
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs