| Assessment Year | 2019 |
|---|---|
| Principal Product | Treated Paper |
| NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
| SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 420 |
| Plant Area |
624,000
ft2
|
| Annual Production | 55,000,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $450,151 | 3,293,000 |
kWh
|
$0.14 | |
| Electricity Demand | $43,212 | 7,502 |
kW-mo/yr
|
$5.76 | |
| Electricity Fees | $2,676 | - |
|
- | |
| Natural Gas | $782,994 | 92,614 |
MMBtu
|
$8.45 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,383 | 402 |
Tgal
|
$8.42 | |
| TOTAL YEARLY COSTS | $1,282,416 | ||||
| RECOMMENDED SAVINGS* | $440,065 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $416,385 | $525,000 | - | - |
$416,385
-
MMBtu
|
|
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $7,204 | $200 |
$7,204
52,587
kWh
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $6,653 | $8,930 | - | - |
$6,653
-
MMBtu
|
|
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,364 | $4,110 |
$3,364
24,552
kWh
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,249 | $1,250 |
$3,249
23,712
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,210 | $2,397 |
$2,968
21,665
kWh
|
$242
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $440,065 | $541,887 |
$16,785
122,516
kWh
|
$242
-
kW-mo/yr
|
$423,038
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs