Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor and generator manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0538 #08 Y:2015 Develop a repair/replace policy $1,483 $4,256
NC0538 #07 Y:2015 Utilize higher efficiency lamps and/or ballasts $424 $1,767
NC0538 #06 Y:2015 Reduce illumination to minimum necessary levels $5,230 $1,875
NC0538 #05 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $828 $100
NC0538 #04 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $7,255 $20,000
NC0538 #03 Y:2015 Reduce space conditioning during non-working hours $2,306 $1,700
NC0538 #02 Y:2015 Replace electrically-operated equipment with fossil fuel equipment $5,806 $21,000
NC0538 #01 Y:2015 Replace electrically-operated equipment with fossil fuel equipment $17,825 $50,000
NC0528 #09 Y:2014 Recharge batteries on during off-peak demand periods $1,119 $100
NC0528 #08 Y:2014 Reduce illumination to minimum necessary levels $471 $275
NC0528 #07 Y:2014 Utilize higher efficiency lamps and/or ballasts $726 $224
NC0528 #06 Y:2014 Utilize higher efficiency lamps and/or ballasts $612 $754
NC0528 #05 Y:2014 Install occupancy sensors $917 $650
NC0528 #04 Y:2014 Utilize energy-efficient belts and other improved mechanisms $3,209 $1,935
NC0528 #03 Y:2014 Eliminate or reduce compressed air usage $1,799 $150
NC0528 #02 Y:2014 Reduce the pressure of compressed air to the minimum required $4,526 $100
NC0528 #01 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $6,097 $100