ITAC Assessment: NC0538
ITAC logo
ITAC Assessment: NC0538
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Motors
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 270,000
ft2
Annual Production 1,800
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,360 4,424,488
kWh
Electricity Demand $46,406 12,542
kW-mo/yr
Natural Gas $20,387 1,995
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,157 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,252

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $17,825 $50,000 $58,742
939,872
kWh
$10,433
-
kW-mo/yr
$(-51,350.0)
-
MMBtu
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,806 $21,000 $5,729
91,667
kWh
$4,070
-
kW-mo/yr
$(-3,993.0)
-
MMBtu
- -
03 2.7224: Reduce space conditioning during non-working hours $2,306 $1,700 $2,306
36,900
kWh
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,255 $20,000 $6,155
98,472
kWh
$1,100
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $828 $100 $839
13,428
kWh
$149
-
kW-mo/yr
- $(-100.0) $(-60.0)
06 2.7111: Reduce illumination to minimum necessary levels $5,230 $1,875 $4,050
64,800
kWh
$719
-
kW-mo/yr
- - $461
07 2.7142: Utilize higher efficiency lamps and/or ballasts $424 $1,767 $424
6,763
kWh
- - - -
08 2.4151: Develop a repair/replace policy $1,483 $4,256 $1,259
20,148
kWh
$224
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $41,157 $100,698 $79,504
1,272,050
kWh
$16,695
-
kW-mo/yr
$(-55,343.0)
-
MMBtu
$(-100.0) $401
TOTAL IMPLEMENTED $1,252 $1,867 $1,263
20,191
kWh
$149
-
kW-mo/yr
- $(-100.0) $(-60.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs