ITAC Assessment: NC0528
ITAC logo
ITAC Assessment: NC0528
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Motors
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $100
M
to 500
M
# of Employees 462
Plant Area 259,000
ft2
Annual Production 1,280
pieces
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $560,939 13,864,800
kWh
Electricity Demand $288,076 25,721
kW-mo/yr
Electricity Fees $703 -
Natural Gas $385,353 51,988
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,476 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,362

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,097 $100 $4,759
117,495
kWh
$1,878
-
kW-mo/yr
$(-300.0) $(-240.0)
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,526 $100 $3,245
80,113
kWh
$1,281
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $1,799 $150 $495
12,219
kWh
$1,304
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,209 $1,935 $2,300
56,800
kWh
$909
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $917 $650 $917
22,638
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $612 $754 $404
9,979
kWh
$160
-
kW-mo/yr
- $48
07 2.7142: Utilize higher efficiency lamps and/or ballasts $726 $224 $232
5,739
kWh
$92
-
kW-mo/yr
- $402
08 2.7111: Reduce illumination to minimum necessary levels $471 $275 $306
7,557
kWh
$122
-
kW-mo/yr
- $43
09 2.3132: Recharge batteries on during off-peak demand periods $1,119 $100 $245
-
kWh
$874
-
kW-mo/yr
- -
TOTAL RECOMMENDED $19,476 $4,288 $12,903
312,540
kWh
$6,620
-
kW-mo/yr
$(-300.0) $253
TOTAL IMPLEMENTED $17,362 $3,139 $11,448
276,606
kWh
$6,406
-
kW-mo/yr
$(-300.0) $(-192.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs