Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other major household appliance manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0298 #13 Y:2023 Recover waste heat from equipment $3,689 $9,000
TT0298 #12 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $4,575 $2,010
TT0298 #11 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $5,983 $9,000
TT0298 #10 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $7,044 $13,500
TT0298 #09 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $7,862 $9,000
TT0298 #08 Y:2023 Reduce the pressure of compressed air to the minimum required $9,325 $22,800
TT0298 #07 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $12,545 $31,800
TT0298 #06 Y:2023 Adopt in-house material generation $20,290 $61,440
TT0298 #05 Y:2023 Isolate hot or cold equipment $25,424 $60,000
TT0298 #04 Y:2023 Insulate bare equipment $26,094 $85,000
TT0298 #03 Y:2023 Use / purchase optimum sized compressor $26,893 $45,000
TT0298 #02 Y:2023 Use solar heat to make electricty $32,300 $196,225
TT0298 #01 Y:2023 Minimize water usage $54,343 $42,000
TT0297 #08 Y:2023 Turn off equipment when not in use $735 $750
TT0297 #07 Y:2023 Reuse rich white water in other applications $1,230 $1,820
TT0297 #06 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $2,512 $6,000
TT0297 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $5,428 $1,950
TT0297 #04 Y:2023 Optimize plant power factor $8,533 $20,000
TT0297 #03 Y:2023 Install occupancy sensors $11,161 $14,500
TT0297 #02 Y:2023 Eliminate or reduce compressed air usage $13,890 $1,250