Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Automatic environmental control manufacturing for residential, commercial, and appliance use
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0364 #10 Y:2014 Eliminate/reduce an operation $2,217 $8,640
SU0364 #09 Y:2014 Install compressor air intakes in coolest locations $175 $620
SU0364 #08 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $296 $1,020
SU0364 #07 Y:2014 Conserve energy by efficient use of vending machines $122 $364
SU0364 #06 Y:2014 Utilize higher efficiency lamps and/or ballasts $13,728 $27,708
SU0364 #05 Y:2014 Install timers on light switches in little used areas $533 $704
SU0364 #04 Y:2014 Reduce illumination to minimum necessary levels $695 $870
SU0364 #03 Y:2014 Reduce the pressure of compressed air to the minimum required $296 -
SU0364 #02 Y:2014 Apply for tax-free status for energy purchases $13,052 -
SU0364 #01 Y:2014 Use or replace with energy efficient substitutes $2,567 -
NC0387 #09 Y:2008 Utilize higher efficiency lamps and/or ballasts $712 $351
NC0387 #08 Y:2008 Utilize higher efficiency lamps and/or ballasts $44,156 $85,555
NC0387 #07 Y:2008 Develop a repair/replace policy $2,019 $2,198
NC0387 #06 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $1,447 $100
NC0387 #05 Y:2008 Recover waste heat from equipment $8,105 $7,000
NC0387 #04 Y:2008 Use cooling tower or economizer to replace chiller cooling $21,000 $25,000
NC0387 #03 Y:2008 Use properly designed and sized hvac equipment $44,613 $45,000
NC0387 #02 Y:2008 Make ice during off peak hours for cooling $51,343 $72,000
NC0387 #01 Y:2008 Use demand controller or load shedder $202,240 $400,000
IC0138 #09 Y:2008 Repair or replace steam traps $14,928 $1,500