ITAC Assessment: SU0364
ITAC logo
ITAC Assessment: SU0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Fuel Cells
NAICS 334512: Automatic Environmental Control Manufacturing for Residential, Commercial, and Appliance Use
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 145
Plant Area 108,500
ft2
Annual Production 918
pieces
Production Hrs. Annual 4,420
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,694 2,274,166
kWh
Electricity Demand $55,879 5,541
kW-mo/yr
Electricity Fees $23,243 -
Natural Gas $82,232 9,761
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,681 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,609

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $2,567 - $1,478
20,250
kWh
$1,089
-
kW-mo/yr
-
02 2.8121: Apply for tax-free status for energy purchases $13,052 - - - $13,052
03 2.4231: Reduce the pressure of compressed air to the minimum required $296 - $296
4,056
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $695 $870 $695
9,524
kWh
- -
05 2.7132: Install timers on light switches in little used areas $533 $704 $533
7,300
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $13,728 $27,708 $9,165
125,554
kWh
$3,750
-
kW-mo/yr
$813
07 2.6211: Conserve energy by efficient use of vending machines $122 $364 $122
1,665
kWh
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $296 $1,020 $296
4,056
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $175 $620 $175
2,393
kWh
- -
10 3.1161: Eliminate/reduce an operation $2,217 $8,640 $(-168.0)
(-2,304)
kWh
$(-2,177.0)
-
kW-mo/yr
$4,562
TOTAL RECOMMENDED $33,681 $39,926 $12,592
172,494
kWh
$2,662
-
kW-mo/yr
$18,427
TOTAL IMPLEMENTED $27,609 $29,432 $9,994
136,910
kWh
$3,750
-
kW-mo/yr
$13,865
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings