ITAC Assessment: GT0548
ITAC logo
ITAC Assessment: GT0548
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Hair Care Products
NAICS
n/a
SIC 2820:
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 100,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,341 2,229,777
kWh
Natural Gas $30,140 4,698
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,060 $350 $1,060
16,706
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $100 $140 $100
1,465
kWh
-
03 2.4314: Use synthetic lubricant $1,530 $3,400 $1,530
22,860
kWh
-
04 3.5311: Recover and reuse waste material $6,960 - - $6,960
-
lb
TOTAL RECOMMENDED $9,650 $3,890 $2,690
41,031
kWh
$6,960
-
lb
TOTAL IMPLEMENTED $9,650 $3,890 $2,690
41,031
kWh
$6,960
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs