Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Search, detection, navigation, guidance, aeronautical, and nautical system and instrument manufactur
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0558 #10 Y:2023 Maintain machines to reduce leaks $94 $181
AS0558 #09 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $259 $154
AS0558 #08 Y:2023 Install timers on light switches in little used areas $317 $1,148
AS0558 #07 Y:2023 Conserve energy by efficient use of vending machines $557 $160
AS0558 #06 Y:2023 Adjust burners for efficient operation $953 $481
AS0558 #05 Y:2023 Install heat pipes / raise cooling setpoint $1,783 $74
AS0558 #04 Y:2023 Install occupancy sensors $4,413 $5,260
AS0558 #03 Y:2023 Use computer programs to optimize hvac performance $11,263 $23,495
AS0558 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $17,306 $21,222
AS0558 #01 Y:2023 Use solar heat to make electricty $42,807 $692,929
MA0854 #06 Y:2023 Reduce the pressure of compressed air to the minimum required $1,399 $3,125
MA0854 #05 Y:2023 Utilize controls to operate equipment only when needed $3,126 $1,425
MA0854 #04 Y:2023 Install occupancy sensors $3,953 $6,018
MA0854 #03 Y:2023 Use or replace with energy efficient substitutes $4,725 $7,950
MA0854 #02 Y:2023 Reduce ventilation air $4,889 $35,240
MA0854 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $6,825 $12,405
UU0215 #08 Y:2023 Insulate bare equipment $228 $1,725
UU0215 #07 Y:2023 Redesign process $913 $2,360
UU0215 #06 Y:2023 Turn off equipment during breaks, reduce operating time $2,565 $1,563
UU0215 #05 Y:2023 Optimize plant power factor $3,212 $5,850