Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

139

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Search, detection, navigation, guidance, aeronautical, and nautical system and instrument manufactur
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0599 #11 Y:2026 Use solar heat to make electricty $247,587 $4,721,768
SU0599 #10 Y:2026 Use or replace with energy efficient substitutes $21,494 $143,758
SU0599 #09 Y:2026 Replace existing hvac unit with high efficiency model $11,060 $26,128
SU0599 #08 Y:2026 Chill water to the highest temperature possible $79 $143
SU0599 #07 Y:2026 Conserve energy by efficient use of vending machines $3,195 $5,578
SU0599 #06 Y:2026 Install compressor air intakes in coolest locations $1,079 $1,860
SU0599 #05 Y:2026 Install / repair insulation on steam lines $671 $329
SU0599 #04 Y:2026 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $5,185 $1,534
SU0599 #03 Y:2026 Install / repair insulation on steam lines $2,106 $566
SU0599 #02 Y:2026 Eliminate/reduce an operation $39,205 -
SU0599 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $1,426 -
UU0287 #10 Y:2025 Turn off equipment when not in use $8,070 $4,800
UU0287 #09 Y:2025 Insulate bare equipment $3,100 $5,260
UU0287 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,100 $5,900
UU0287 #07 Y:2025 Eliminate or reduce compressed air usage $11,700 $11,700
UU0287 #06 Y:2025 Install occupancy sensors $75,500 $160,000
UU0287 #05 Y:2025 Use solar heat to make electricty $32,200 $261,000
UU0287 #04 Y:2025 Use plant owned transformers or lease transformers $7,500 $10,500
UU0287 #03 Y:2025 Change rate schedules or other changes in utility service $16,300 $2,160
UU0287 #02 Y:2025 Use demand controller or load shedder $40,400 $39,000