Assessment Year 2023
Principal Product Aerospace Structural Components
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $10
M
to 50
M
# of Employees 227
Plant Area 153,616
ft2
Annual Production 9,000
units
Production Hrs. Annual 6,300
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,435 1,763,468
kWh
Electricity Demand $84,608 5,014
kW-mo/yr
Electricity Fees $19,495 -
Natural Gas $129,387 13,094
MMBtu
TOTAL YEARLY COSTS $296,925
RECOMMENDED SAVINGS* $37,699 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,939

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2691: Shut off cooling if cold outside air will cool process $13,760 $120,564 $4,648
129,123
kWh
$9,112
-
kW-mo/yr
- -
02 2.1223: Install smaller boiler (increase high fire duty cycle) $4,878 $48,510 - - - $4,878
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,368 $27,177 $3,044
84,320
kWh
$3,324
-
kW-mo/yr
- -
04 2.4226: Use / purchase optimum sized compressor $5,775 $52,882 $2,653
73,704
kWh
$3,122
-
kW-mo/yr
- -
05 2.3212: Optimize plant power factor $3,212 $5,850 - - $3,212 -
06 2.6212: Turn off equipment during breaks, reduce operating time $2,565 $1,563 $2,565
71,252
kWh
- - -
07 2.5194: Redesign process $913 $2,360 $334
9,277
kWh
$579
-
kW-mo/yr
- -
08 2.2511: Insulate bare equipment $228 $1,725 $132
3,670
kWh
$96
-
kW-mo/yr
- -
TOTAL RECOMMENDED $37,699 $260,631 $13,376
371,346
kWh
$16,233
-
kW-mo/yr
$3,212 $4,878
-
MMBtu
TOTAL IMPLEMENTED $23,939 $140,067 $8,728
242,223
kWh
$7,121
-
kW-mo/yr
$3,212 $4,878
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs