ITAC Assessment: OD0121
ITAC logo
ITAC Assessment: OD0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Paper Moisture Barriers
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 300,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,337 3,848,769
kWh
Electricity Demand $106,193 7,007
kW-mo/yr
Electricity Fees $2,471 -
Natural Gas $72,643 11,895
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,608 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,320

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,192 $6,908 $4,853
305,100
kWh
$6,339
-
kW-mo/yr
- - -
02 2.4113: Install motor voltage controller on lightly loaded motors $3,843 $9,910 $1,402
88,218
kWh
$2,441
-
kW-mo/yr
- - -
03 2.7224: Reduce space conditioning during non-working hours $241 $420 $241
15,240
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $365 $220 $365
22,860
kWh
- - - -
05 2.2113: Repair or replace steam traps $672 $110 - - $672
-
MMBtu
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,833 $1,495 - - $1,833
-
MMBtu
- -
07 2.2111: Install steam trap $1,445 $560 - - $1,226
-
MMBtu
$219
-
Tgal
-
08 2.4156: Establish a preventative maintenance program $10,017 $2,800 - - - - $10,017
TOTAL RECOMMENDED $29,608 $22,423 $6,861
431,418
kWh
$8,780
-
kW-mo/yr
$3,731
-
MMBtu
$219
-
Tgal
$10,017
TOTAL IMPLEMENTED $24,320 $11,953 $5,459
343,200
kWh
$6,339
-
kW-mo/yr
$2,505
-
MMBtu
- $10,017
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs