UU0262 #08 Y:2024 | 08 | 2024 | Optimize plant power factor | $5,129 | $12,300 |
n/a
|
UU0262 #07 Y:2024 | 07 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,117 | $834 |
n/a
|
UU0262 #06 Y:2024 | 06 | 2024 | Minimize operation of equipment maintained in standby condition | $720 | $1,680 |
n/a
|
UU0262 #05 Y:2024 | 05 | 2024 | Use or replace with energy efficient substitutes | $762 | $2,640 |
n/a
|
UU0262 #04 Y:2024 | 04 | 2024 | Reduce air conditioning load by evaporating water from roof | $13,561 | $178,488 |
n/a
|
UU0262 #03 Y:2024 | 03 | 2024 | Insulate bare equipment | $24,314 | $29,878 |
n/a
|
UU0262 #02 Y:2024 | 02 | 2024 | Use waste heat to produce steam to drive a steam turbine-generator | $14,276 | $180,000 |
n/a
|
UU0262 #01 Y:2024 | 01 | 2024 | Use waste heat steam for absorption refrigeration | $12,361 | $217,800 |
n/a
|
UU0251 #08 Y:2024 | 08 | 2024 | Reduce the pressure of compressed air to the minimum required | $180 | $300 |
n/a
|
UU0251 #07 Y:2024 | 07 | 2024 | Replace fossil fuel equipment with electrical equipment | $2,290 | $5,750 |
n/a
|
UU0251 #06 Y:2024 | 06 | 2024 | Utilize higher efficiency lamps and/or ballasts | $6,210 | $6,486 |
n/a
|
UU0251 #05 Y:2024 | 05 | 2024 | Demolish old building to reduce tax and insurance bills | $8,918 | $750 |
n/a
|
UU0251 #04 Y:2024 | 04 | 2024 | Recover waste heat from equipment | $9,830 | $19,570 |
n/a
|
UU0251 #03 Y:2024 | 03 | 2024 | Purchase gas directly from a contract gas supplier | $23,190 | $1,500 |
n/a
|
UU0251 #02 Y:2024 | 02 | 2024 | Keep doors and windows shut when not on use | $27,500 | $13,788 |
n/a
|
UU0251 #01 Y:2024 | 01 | 2024 | Change rate schedules or other changes in utility service | $38,394 | $100,000 |
n/a
|
OK1113 #05 Y:2024 | 05 | 2024 | Utilize higher efficiency lamps and/or ballasts | $125 | $611 |
n/a
|
OK1113 #04 Y:2024 | 04 | 2024 | Install sub-metering equipment | $1,500 | $1,100 |
n/a
|
OK1113 #03 Y:2024 | 03 | 2024 | Use solar heat to make electricty | $25,346 | $210,600 |
n/a
|
OK1113 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,798 | $1,675 |