Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

307

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Semiconductor and related device manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0603 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $7,376 $17,707
LE0603 #04 Y:2025 Use cooling tower or economizer to replace chiller cooling $22,734 $28,902
LE0603 #03 Y:2025 Utilize controls to operate equipment only when needed $12,478 $2,000
LE0603 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $2,615 -
LE0603 #01 Y:2025 Install timers and/or thermostats $18,401 -
DL0257 #05 Y:2025 Install timers and/or thermostats $291 $131
DL0257 #04 Y:2025 Use optimum temperature $1,329 -
DL0257 #03 Y:2025 Utilize controls to operate equipment only when needed $343 -
DL0257 #02 Y:2025 Reduce space conditioning during non-working hours $4,000 -
DL0257 #01 Y:2025 Use solar heat to make electricty $58,383 $470,000
AM0942 #08 Y:2025 Turn off equipment when not in use $474 -
AM0942 #07 Y:2025 Install occupancy sensors $1,037 $376
AM0942 #06 Y:2025 Treat and reuse rinse waters $1,240 $350
AM0942 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,970 $10,150
AM0942 #04 Y:2025 Use proper thickness of insulation on building envelope $6,250 $42,340
AM0942 #03 Y:2025 Meter recycled water (to reduce sewer charges) $12,400 -
AM0942 #02 Y:2025 Use solar heat to make electricty $15,120 $137,270
AM0942 #01 Y:2025 Apply for tax-free status for energy purchases $189,590 $15,000
UC2416 #10 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $55,311 $819,496
UC2416 #09 Y:2024 Replace existing hvac unit with high efficiency model $80,097 $301,647