ITAC Assessment: UC2416
ITAC logo
ITAC Assessment: UC2416
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Semiconductor wafers
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $5
M
to 10
M
# of Employees 500
Plant Area 92,600
ft2
Annual Production 130,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,034,443 9,948,743
kWh
Electricity Demand $356,769 15,359
kW-mo/yr
Natural Gas $459,494 53,316
MMBtu
TOTAL YEARLY COSTS $1,850,705
RECOMMENDED SAVINGS* $635,086 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,662 $1,600 $15,055
144,761
kWh
$4,607
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $159,604 $5,236 $98,630
948,361
kWh
$30,179
-
kW-mo/yr
$30,796
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,767 $1,553 $1,239
11,914
kWh
$379
-
kW-mo/yr
- $149
04 2.7135: Install occupancy sensors $510 $218 $510
4,380
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $73,494 $29,062 $56,275
541,105
kWh
$17,219
-
kW-mo/yr
- -
06 2.2511: Insulate bare equipment $3,536 $1,750 - - $3,536
-
MMBtu
-
07 2.2136: Install / repair insulation on steam lines $294 $139 - - $294
-
MMBtu
-
08 2.2622: Replace existing chiller with high efficiency model $240,811 $2,527,500 $184,391
1,772,991
kWh
$56,420
-
kW-mo/yr
- -
09 2.7232: Replace existing hvac unit with high efficiency model $80,097 $301,647 $61,331
589,723
kWh
$18,766
-
kW-mo/yr
- -
10 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $55,311 $819,496 $268,843
2,585,030
kWh
$6,855
-
kW-mo/yr
$(-220,387.0)
-
MMBtu
-
TOTAL RECOMMENDED $635,086 $3,688,201 $686,274
6,598,266
kWh
$134,424
-
kW-mo/yr
$(-185,761.3)
-
MMBtu
$149
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs