Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Scale and balance manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0506 #07 Y:2017 Re-arrange equipment layout to reduce handling costs $60,000 $55,338
UF0506 #06 Y:2017 Install set-back timers $1,014 $667
UF0506 #05 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $2,010 $6,500
UF0506 #04 Y:2017 Utilize controls to operate equipment only when needed $2,070 $1,171
UF0506 #03 Y:2017 Install common header on compressors $4,067 $3,216
UF0506 #02 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $4,519 $1,169
UF0506 #01 Y:2017 Use most efficient type of electric motors $5,263 $5,454
UD0758 #13 Y:2006 Eliminate or reduce compressed air usage $320 $200
UD0758 #12 Y:2006 Turn off equipment when not in use $430 -
UD0758 #11 Y:2006 Eliminate or reduce compressed air usage $538 -
UD0758 #10 Y:2006 Utilize energy-efficient belts and other improved mechanisms $876 $144
UD0758 #09 Y:2006 Optimize plant power factor $992 $3,000
UD0758 #08 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $3,876 $2,500
UD0758 #07 Y:2006 Turn off equipment when not in use $5,657 -
UD0758 #06 Y:2006 Recover waste heat from equipment $7,786 -
UD0758 #05 Y:2006 Use minimum safe oven ventilation $9,717 $595
UD0758 #04 Y:2006 Use plant owned transformers or lease transformers $10,225 $15,000
UD0758 #03 Y:2006 Use power during off-peak periods $12,438 -
UD0758 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $13,028 $36,900
UD0758 #01 Y:2006 Reduce ventilation air $24,896 -