Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Pump and compressor manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0103 #11 Y:2017 Insulate bare equipment $1,543 $504
WM0103 #10 Y:2017 Use optimum temperature $9,226 -
WM0103 #09 Y:2017 Turn off equipment when not in use $131 -
WM0103 #08 Y:2017 Utilize energy-efficient belts and other improved mechanisms $8,484 $3,000
WM0103 #07 Y:2017 Use synthetic lubricant $26,785 $47,960
WM0103 #06 Y:2017 Conserve energy by efficient use of vending machines $459 $690
WM0103 #05 Y:2017 Lower temperature during the winter season and vice-versa $7,422 -
WM0103 #04 Y:2017 Install compressor air intakes in coolest locations $1,488 $302
WM0103 #03 Y:2017 Utilize higher efficiency lamps and/or ballasts $19,337 $24,875
WM0103 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $823 $800
WM0103 #01 Y:2017 Install occupancy sensors $2,287 $1,245
WI0477 #07 Y:2004 Reduce the pressure of compressed air to the minimum required $582 -
WI0477 #06 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $938 -
WI0477 #05 Y:2004 Install timers and/or thermostats $923 -
WI0477 #04 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $1,817 $433
WI0477 #03 Y:2004 Interlock heating and air conditioning systems to prevent simultaneous operation $2,765 $605
WI0477 #02 Y:2004 Utilize higher efficiency lamps and/or ballasts $4,524 $855
WI0477 #01 Y:2004 Reschedule plant operations or reduce load to avoid peaks $10,743 -